Material resource planning software for manufacturers: MRP and MRP II

Material resource planning software works out what your factory has to buy and make, how many and by when, so that every customer order has its parts on time without a warehouse full of stock nobody needs. It turns the production plan and your bills of materials into dated purchase and production proposals, warns when something is already late, and in its full form, manufacturing resource planning or MRP II, checks the plan against the hours your machines and people actually have. We build MRP software around your products, order rules and work centres, connect it to your ERP, host it in the EU and hand your company the source code.

  • You see the result before it goes live
  • Fixed price for the agreed scope, in writing before work starts
  • Source code, domain and accounts in your company's name

Request a quote

Material requirements, material resource or manufacturing resource planning?

Three names circulate for related things, and it helps to separate them before choosing software. Material requirements planning, MRP, is the calculation itself: from what you plan to make, explode the bills of materials level by level, subtract what is in stock or already on order, and offset what is missing by its lead time. Material resource planning is the name many buyers use for the same calculation, and it is the name on this page. Manufacturing resource planning, written MRP II, is the larger system built around that calculation: a master production schedule, capacity planning on work centres, shop floor control, purchasing and costing, all working from one plan. ERP grew out of MRP II by adding finance, sales and the rest of the company.

In practice, a plant asking for MRP software usually needs one of three things: a reliable material plan where today there is a spreadsheet, a planning layer on top of an ERP whose own MRP nobody trusts, or the MRP II pieces that connect the material plan to real capacity.

What MRP software calculates

The inputs are the same in every plant, and so is the logic. What differs is the products, the order rules and the quality of the data.

The output is a time-phased record for every item: gross requirements, scheduled receipts, projected stock, net requirements and planned orders. Alongside it come exception messages, the part planners actually work from: release this order now, bring that order forward, push this one back, cancel the one no longer needed, and the list of orders that should already have been placed.

A worked example: one product, two levels

A made-up example shows the logic. A workshop assembles tables. Each table needs one top and four legs. Assembly takes one week. Tops are bought with a two-week lead time, legs with a one-week lead time in boxes of 100. Today there are 20 tables, 50 tops and 100 legs in stock, nothing on order, and customers want 60 tables in week 3 and 40 in week 4.

Week1234
Table (assembled, 1 week)
Gross requirements006040
Planned receipts004040
Projected stock202000
Order release040400
Top (bought, 2 weeks)
Gross requirements040400
Planned receipts00300
Projected stock501000
Order release30000
Leg (bought, 1 week, boxes of 100)
Gross requirements01601600
Planned receipts01002000
Projected stock100408080
Order release10020000

The 20 tables in stock cover part of week 3, so 40 must be assembled for week 3 and 40 for week 4, which means assembly starts in weeks 2 and 3. Those assembly starts become the gross requirements of the components: 40 tops in each of weeks 2 and 3, and 160 legs in each. The 50 tops in stock last until week 3, where 30 more are needed, and with a two-week lead time they have to be ordered this week. The legs run short in week 2, so one box is ordered this week and two boxes next week; the rounding to whole boxes leaves 80 spare legs.

The planner's result for week 1 is two purchase proposals: 30 tops and one box of legs. Nobody works through these tables by hand. The software does it for every item, on every level of every bill of materials, and shows the planner only the proposals and the exceptions. If the customer moves the week 3 order forward by one week, the top order is already late, and the exception list says so the same day.

From MRP to MRP II: manufacturing resource planning software

A material plan assumes the plant can make whatever it plans. Manufacturing resource planning software checks that assumption and closes the loop between the plan and the shop floor.

Capacity planning in MRP II shows overloads; it does not sequence the jobs on each machine. When the question becomes which order runs first on which machine, that is finite scheduling, covered on our production scheduling software page. Many plants need both: MRP II for the weeks ahead and a scheduler for the days ahead.

Why MRP plans fail, and what the software must handle

MRP has a reputation for producing plans that planners ignore. The calculation is rarely the cause. The usual causes are the data and the rules around it, and good software is built to handle them.

Ready-made MRP software or custom?

There are capable ready-made options: MRP in ERPs such as SAP S/4HANA, Microsoft Dynamics 365 Business Central and Odoo, and standalone products for smaller manufacturers such as MRPeasy and Katana. For a plant with standard products and an ERP that plans well, configuring what you have is usually the faster route, and we will say so in the first reply to your brief.

SituationReady-made MRPCustom MRP software
Standard products, an ERP with working MRPUsually the right choiceRarely worth building
Planning done in spreadsheets beside the ERPPossible, if the ERP supports itThe spreadsheet's logic, made reliable and connected
Configure-to-order, recipes, co-products, potencyConfigured where the product allowsBuilt in as your products work
Several plants supplying each otherOften an extra modulePlanned as one network
Older or home-made ERPAn integration project of its ownRead through whatever it exposes
Ownership of data and codeLicensed per user or siteIn your company's own account

Connected to the ERP, the shop floor and suppliers

MRP software lives on other systems' data. Items, bills of materials, routings, stock and open orders are read from the ERP through its interface or a file export it accepts, on a schedule you choose. Approved planned orders go back as purchase and production orders. Reported production comes from the shop floor terminals or machines; supplier confirmations come from email, a supplier portal or EDI. When the factory distributes through several warehouses, the warehouse demand from distribution resource planning software becomes an input to MRP. For the wider system, see ERP for manufacturing and inventory management software.

How we build it

  1. Map the planning. Products, bills of materials, routings, order rules and how planners decide today, written down with the people who do it.
  2. Scope and fixed price in writing. Items, plants, integrations and what the first phase leaves out, signed before work starts.
  3. Clean the records. Bills of materials, lead times and stock checked against reality for the items that matter most.
  4. Back-test and run in parallel. The plan is run on past orders and then beside the current way of planning for a few cycles, and parameters are tuned.
  5. Go live and measure. Late orders, shortages, stock value and planners' hours are compared with the figures recorded at the start.

You own it

As a standard term, the source code sits in a repository in your company's own account, and the database and hosting are in your company's name, running in an EU data region. You can keep us for maintenance, run it yourself or hand it to another team. For a plant that wants the whole picture on screens, see dashboard development. For orders, invoicing and the rest of the back office, see cloud-based ERP software for small business. See prices.

Questions we get

Is it material requirements planning or material resource planning?

The method is formally called material requirements planning: working out which materials and parts to buy or make, how many and when, from the production plan and the bills of materials. Material resource planning is a common everyday name for the same thing. Manufacturing resource planning, MRP II, is the wider system that adds capacity, shop floor and cost to the material plan.

What is the difference between MRP and MRP II?

MRP calculates materials: quantities and dates for purchase and production orders. MRP II, manufacturing resource planning, checks whether the plant can actually make that plan, with rough-cut and detailed capacity planning on work centres, and connects it to shop floor control, purchasing and costing. ERP later extended the same idea to the whole company.

What data does MRP software need?

A master production schedule or the customer orders and forecast it is built from, bills of materials with quantities per parent, stock on hand and on order, lead times, and order rules such as minimum quantities, multiples and safety stock. For MRP II you also need routings with operation times and the available hours of each work centre. The plan is only as accurate as these records, so the first phase usually includes cleaning them.

Can MRP run on top of our existing ERP?

Yes, and that is often the sensible route when the ERP holds orders, stock and accounting well but plans poorly. The planning layer reads items, bills of materials, stock and open orders from the ERP and writes approved planned orders back as purchase and production orders. Nothing is retyped.

How often should MRP run?

Most plants run a full regeneration nightly and let planners re-plan single items during the day when an order changes. Plants with short lead times and frequent changes sometimes run net-change planning several times a day. A frozen period near the present stops the plan from changing orders that are already in progress.

Who owns the software?

Your company. The source code is in a repository in your own account, and the database and hosting are in your company's name, in an EU data region.