Preventive maintenance scheduling software for plants, fleets and facilities

Preventive maintenance scheduling software makes sure the service you planned actually happens: every machine, vehicle, lift and building system has a maintenance plan, the plan turns into work orders at the right time by calendar, running hours or measured condition, technicians get the checklist, the parts and the safety steps, and the history stays with the asset for the next inspection or audit. We build custom preventive maintenance scheduling software around your assets, your plans and the systems you already use, hosted in the EU, and your company owns the code.

  • You see the result before it goes live
  • Fixed price for the agreed scope, in writing before work starts
  • Source code, domain and accounts in your company's name

Request a quote

Why planned maintenance slips

Almost every maintenance team has a plan. The trouble is that the plan lives in a spreadsheet, a binder or the head of the longest-serving technician, while the day is driven by breakdowns. A service that is due falls behind because production will not release the machine, the part was never ordered, or nobody noticed the meter had passed the limit. Months later, the same machine stops in the middle of a rush order, and nobody can say when it was last serviced.

Software does not fix that by itself, but it removes the reasons plans slip: due work is visible weeks ahead, parts are reserved before the job, maintenance windows are agreed with production, and overdue work cannot quietly disappear.

What the system covers

PartWhat it handles
Asset registerMachines, vehicles, buildings and systems, with location, parent and child assets, documents and criticality
Maintenance plansTasks, intervals and triggers per asset or asset type, including manufacturer instructions
Work ordersPlanned, corrective and inspection work, with checklists, safety steps, parts and time
SchedulingTechnicians, skills, shifts, contractors and maintenance windows agreed with production
Spare partsParts per asset, reservations for planned jobs, minimum stock and reorders; see spare parts inventory management software
InspectionsStatutory and manufacturer inspections, competent persons, results and certificates
ReportingPlanned against reactive work, schedule compliance, backlog, downtime and cost per asset

Triggers: time, usage and condition

A good plan uses the trigger that matches how each asset wears. The system supports all of them, side by side:

Plans can combine triggers, such as every 500 running hours or every six months, whichever comes first, and they can float or stay fixed: a floating plan counts from the last completed job, a fixed plan stays on its calendar even if one service was late. Both are needed, and the difference matters when an inspector asks about intervals.

Statutory inspections and the maintenance record

Much preventive maintenance is not optional. In the EU, the Work Equipment Directive requires the employer to ensure that, throughout its working life, work equipment is kept, by means of adequate maintenance, at a level that complies with the safety requirements, and that equipment exposed to conditions causing deterioration is subject to periodic inspections and, where appropriate, testing by competent persons. The results of inspections shall be recorded and kept at the disposal of the authorities, and equipment used outside the undertaking must be accompanied by physical evidence that the last inspection has been carried out (Directive 2009/104/EC, Articles 4(2) and 5, read on 11 November 2026). Member States set the details, so inspection types and intervals are configured per country.

New machinery adds the manufacturer's side. Under the EU Machinery Regulation, the instructions for use shall indicate the type and frequency of inspections and maintenance required for safety reasons, and where appropriate the parts subject to wear and the criteria for replacement; the Regulation applies from 14 January 2027 (Regulation (EU) 2023/1230, Annex III, section 1.3.2, and Article 54, read on 11 November 2026). We load those intervals into the plan when a machine is registered, so the manufacturer's schedule is the starting point rather than a PDF in a folder.

In the United States, some checks are daily: industrial trucks shall be examined before being placed in service, and the examination shall be made at least daily (29 CFR 1910.178(q)(7), read on 11 November 2026). A pre-use checklist in the app, scanned from a code on the truck, makes that check quick and leaves a record; a failed check takes the truck out of service until it is fixed.

Lockout steps inside the work order

Servicing a machine that can start unexpectedly is one of the most dangerous jobs in a plant. The OSHA standard on the control of hazardous energy requires an energy control program of procedures, training and periodic inspections, and a periodic inspection of the energy control procedure at least annually by an authorized employee other than the ones using the procedure (29 CFR 1910.147(c)(1) and (c)(6), read on 11 November 2026). EU and national rules set similar duties.

In the system, each asset carries its energy isolation procedure, and every work order on that asset shows the steps, the isolation points and the sign-off before work starts and before the machine is returned to service. The annual inspection of each procedure is itself a planned task with its own record. The software does not make anyone safe, but it puts the right procedure in front of the right person every time.

Scheduling around production and people

Planned maintenance competes with production for the same machine. The system shows due work weeks ahead, groups tasks on the same line so one stop covers several jobs, and shares proposed maintenance windows with production planning, so service is agreed rather than squeezed in. Technicians are assigned by skill, certification and shift; work that needs an outside contractor or a competent inspector is booked with them, and their reports are attached to the asset. For capacity planning on the production side, see production scheduling software; for maintenance done at customers' sites, see field service management software.

The technician app

Machine data and the Data Act

Usage and condition triggers need data from the machines. Where control systems offer it, we read running hours, counts and condition values through standard interfaces; OPC UA, released in 2008, is a platform independent service-oriented architecture with encryption, authentication and auditing built in, and is widely supported in industrial equipment (OPC Foundation, read on 11 November 2026). Older machines can get a simple sensor or a meter reading in the app. For connected devices and gateways, see IoT software development.

The EU Data Act helps owners of new equipment. Connected products shall be designed and manufactured so that product data, including the metadata needed to interpret it, are by default easily, securely and free of charge accessible to the user, where relevant and technically feasible directly; that obligation applies to connected products placed on the market after 12 September 2026 (Regulation (EU) 2023/2854, Articles 3(1) and 50, read on 11 November 2026). When you buy new machines, it is worth asking how that data will be made available, so your maintenance system can use it.

What to measure

A maintenance system earns its place when the numbers move. We set up a small set of measures from the first day: the share of planned against reactive work, schedule compliance (planned work done in its window), overdue work and backlog, mean time between failures and mean time to repair for critical assets, downtime by cause, and maintenance cost per asset. The baseline is recorded before go-live, so the change can be shown rather than claimed. For reporting across systems, see dashboard development.

What is CMMS software?

CMMS software (computerised maintenance management system) is the register and planner for everything a maintenance team looks after: the asset list with locations and documents, preventive maintenance plans, work orders, spare parts, technicians' time and the full maintenance history per asset. Preventive maintenance scheduling is the part of a CMMS that decides when each job is due and who does it. An EAM system (enterprise asset management) adds the financial life of assets, from purchase to disposal. The system described on this page is a CMMS built around your assets and plans, and it can grow into the EAM direction when you need it. For a plain explanation of CMMS modules, types and the difference from EAM, read our guide what is a CMMS.

Ready-made CMMS or custom software?

There are many established maintenance management products, often called CMMS or EAM systems, and the maintenance modules of large ERP systems. For a site with standard assets and standard plans, one of them may be enough, and we will say so. Custom software pays off when your assets, inspection rules or workflows do not fit, when maintenance must be tightly linked to your own production or ERP data, when you run several kinds of sites, or when you want the system and the data in your own account.

SituationReady-made productCustom software
One site, standard assets and plansUsually enoughRarely worth building
Inspection rules in several countriesDepends on the productRules configured per country
Machine data and condition triggersThe vendor's connectorsBuilt for your machines and data platform
Links to your ERP and production planningStandard integrationsBuilt around your data
Data location and ownershipThe vendor's platform and regionYour account, EU data region

How we build it

  1. Start with the critical assets. We list the assets whose failure costs the most, their current plans, inspections and failure history, and how work is ordered today.
  2. Scope and fixed price in writing. Asset register, plan types, triggers, the technician app, integrations and what the first phase leaves out.
  3. Load the real plans. Assets, plans and the last service dates are imported, so the first schedule shows what is actually due and overdue.
  4. Go live with one site or team. Technicians use the app daily, plans and checklists are corrected, and paper stops when the records are complete.
  5. Measure and extend. Planned work share, compliance and downtime are compared with the baseline, then machine data, more sites or predictive triggers are added.

For the ERP side of a plant, see manufacturing ERP. For solar, wind, storage and grid assets, see energy software development.

You own it

As a standard term, the source code sits in a repository in your company's own account, and the database and hosting are in your name in an EU data region. Plans and checklists are readable configuration you can change. You can keep us for maintenance, run it yourself or hand it to another team. For heating, cooling and refrigeration contractors who maintain customers' units, see HVAC field service management software. For spare parts, purchasing and cost per asset in one back office, see ERP systems for small business. See prices.

Questions we get

What is preventive maintenance scheduling software?

It is software that keeps a register of your assets, such as machines, vehicles, lifts, pumps or building systems, holds a maintenance plan for each one and turns that plan into work orders at the right time: by calendar, by running hours or other meter readings, or when a measured condition crosses a limit. Technicians get the work orders with checklists, record what they did and which parts they used, and the history stays with the asset.

What is the difference between time-based, usage-based and condition-based maintenance?

Time-based maintenance happens at fixed intervals, such as every three months. Usage-based maintenance follows a meter, such as every 500 running hours or 10,000 cycles. Condition-based maintenance is triggered when a measured value, such as vibration, temperature or pressure, crosses a limit. Most plants use all three, and the software handles each asset with the trigger that fits it.

Can it track statutory inspections as well as maintenance?

Yes. Inspections required by law or by the manufacturer, such as periodic inspections of lifting equipment, pressure systems or forklifts, are stored as their own plans with the competent person or body that performs them, the due dates and the results. The record of each inspection is kept with the asset, so it can be shown to an inspector or auditor.

Can it read meter values from our machines automatically?

Where the machines or their control systems can provide them, yes. Running hours, cycle counts and condition values can be read from PLCs, controllers or sensors through standard interfaces such as OPC UA, or through the data platform you already have. Where that is not possible, technicians enter readings in the app, and the system checks that values make sense.

Does it replace our ERP or production planning?

Usually not. The maintenance system sits next to them: it reads assets, cost centres and spare part stock from the ERP and books parts and hours back, and it shares planned maintenance windows with production planning so service stops are planned rather than discovered.

Who owns the system and the data?

Your company. The source code sits in a repository in your own account, and the database and hosting are in your name in an EU data region. You can keep us for maintenance, run it yourself or hand it to another team.