Skip to content
DT Nova
Services

Solar installer software from the first survey to grid connection

Solar installer software that keeps every PV and battery project moving: site surveys and proposals, permits and grid connection applications with their waiting times, roof crews and electricians planned in the right order, materials on site on the day, commissioning reports done before the crew leaves, and service after the system is running. We build custom solar installation management software for residential and commercial solar installers, hosted in the EU, and your company owns the code.

  • You see the result before it goes live
  • Fixed price for the agreed scope, in writing before work starts
  • Source code, domain and accounts in your company's name

Request a quote

Why solar installers outgrow spreadsheets and CRMs

Our field service management software page covers companies with technicians on the road in general. A solar installer runs projects rather than visits, and each project passes through stages owned by different people: sales, design, paperwork, procurement, roof work, electrical work, commissioning and handover. The slowest stages, permits and grid applications, are outside your control, and a project that stalls there ties up stock and leaves crews without work. A CRM tracks the sale; a spreadsheet tracks the rest, until the number of projects makes the spreadsheet the bottleneck.

What the system does

Demand from the building rules

EU building rules are moving solar from an option to a requirement. The recast Energy Performance of Buildings Directive requires Member States to ensure the deployment of suitable solar energy installations, where technically suitable and economically and functionally feasible, on new public and non-residential buildings with a useful floor area larger than 250 m² by 31 December 2026, on existing public buildings in steps from 2027 to 2030, on existing non-residential buildings larger than 500 m² that undergo a major renovation or roof works from 31 December 2027, and on all new residential buildings and new roofed car parks adjacent to buildings by 31 December 2029. It also applies the permit-granting and simple grid notification procedures of the Renewable Energy Directive to solar installations on buildings (Directive (EU) 2024/1275, Article 10, read on 12 November 2026). Member States set the national criteria and exemptions.

For installers this means more commercial and public projects with formal tendering, documentation and handover requirements, alongside residential work. The system holds both: commercial projects with phases, documents and acceptance, and residential projects that move through a standard flow quickly.

Permits and grid connection without lost weeks

Each project carries its paperwork as tasks: the building permit or notification where one is needed, the grid connection application or notification to the network operator, any subsidy or tax credit documentation, and the final notifications after commissioning. Each task has its documents, submission date, reference number and expected answer time. The board shows every project waiting on an authority or network operator and for how long, so the office chases the right ones, and crews are only booked when the steps you require are approved. Document templates fill from project data, so the same address, system size and component list are not typed into five forms.

Crews, roofs and safety

Solar installation combines roof work and electrical work, often by different people on different days. In the United States, OSHA requires employees doing roofing work on low-slope roofs with unprotected sides and edges 6 feet or more above lower levels to be protected by guardrails, safety nets, personal fall arrest or a combination with warning lines, employees on steep roofs to be protected by guardrails with toeboards, safety nets or personal fall arrest, and employees in residential construction 6 feet or more above lower levels to be protected by guardrails, safety nets or personal fall arrest unless another provision allows an alternative (29 CFR 1926.501(b)(10), (11) and (13), read on 12 November 2026). European countries apply their own work at height rules. Electrical work follows national wiring rules, such as NEC Article 690 in the United States, and is done by people qualified for it.

The system plans the tasks in order: mounting before panels, panels before electrical connection, connection before commissioning. Each task needs a crew type, such as a roof crew with fall protection training or an electrician with the right qualification, and the board only suggests people who hold them on the day. The job carries the fall protection plan for that roof, the equipment needed and a pre-start check the crew completes before going up. When wind or rain stops roof work, the board shows which projects move and which electricians can be moved to indoor work such as battery or charger installations.

Materials on site on the day

Panels, inverters, batteries and mounting systems are expensive, bulky and sometimes scarce. The system reserves components for each project from stock or orders them from the distributor, tracks expected delivery dates, and warns when a project is booked for installation before its materials arrive. Serial numbers of panels, inverters and batteries are scanned at installation and stored on the asset, which makes warranty claims and recalls possible later. For stock in general, see inventory management software.

Commissioning and handover

The electrician completes the commissioning checklist in the app: string voltages and currents, insulation resistance, earthing, inverter settings, battery configuration and protection settings required by the network operator, with photos of labels and the installation. The system generates the commissioning report and the handover pack from your templates, with the system description, component list, serial numbers, test results and user instructions, and sends it to the customer. Grid notifications that follow commissioning are created as tasks automatically.

Service, monitoring and maintenance

An installed system is an asset you may service for many years. Inverter and monitoring platforms, such as those from SolarEdge, Enphase, Huawei or SMA, send production data and alarms; where the platform offers an interface, alarms become service jobs on the right asset, and low production can be flagged for inspection. Maintenance contracts plan inspections and cleaning visits. Warranty claims carry the serial numbers, photos and test results the manufacturer asks for. For energy data beyond the installation, see energy management software.

The installer app

Surveyors, roof crews and electricians use the same app with different views: survey checklists and measurements, the day's project with drawings and materials, safety checks, installation steps, serial scanning, commissioning readings and the customer's signature. It works offline on roofs and in new buildings without coverage and syncs when the signal returns. We build for iPhone and Android from one codebase.

Ready-made solar software or custom?

There are established products for parts of the job: design and proposal tools such as Aurora Solar and OpenSolar, solar CRMs, and general field service products. For many installers a combination fits, and we will say so. Custom software pays off when the project flow, your national permit and grid steps, your crew rules or your service business do not match what the products assume, or when the work between signed contract and grid connection still runs in spreadsheets.

SituationReady-made productsCustom software
Design and proposalsSpecialised tools do this wellKeep them and connect them
Permits and grid steps in your countryGeneric task listsYour authorities, operators and forms
Roof and electrical crews in sequenceBasic schedulingTasks in order, qualifications checked
Service on installed systemsOften a separate toolAssets, alarms and warranty on one record
Data location and ownershipThe vendor's platform and regionYour account, EU data region

How we build it

  1. Workshop with sales, office and crews. Your project coordinators, installers and electricians show how a project moves today and where it waits. We write the flow down for approval.
  2. Scope and fixed price in writing. Pipeline stages, paperwork tasks, crew rules, integrations and what the first phase leaves out, with a fixed price for that agreed scope.
  3. A test version on real data. Your open projects, crews and stock, so the board can be compared with the spreadsheet.
  4. Pilot and acceptance. One team runs its projects in the system for a few weeks, the flow is tuned, and the phase is accepted against the written scope.
  5. Roll out and measure. Days from contract to installation, days waiting on paperwork, crew idle days and time to handover are compared with the numbers recorded at the start.
  6. Maintenance. Updates, monitoring, backups and changes when permit or grid rules change, on a monthly plan you can cancel with one month's notice.

As a standard term, the source code sits in a repository in your company's own account, and the database and hosting are in your name. Installers who are also general electrical contractors can run both on one base; see electrical contractor software. See prices.

Questions we get

What does solar installer software cover?

The whole project: lead and site survey, design and proposal, contract, permit and grid connection applications, material ordering, crew scheduling for roof and electrical work, installation checklists, commissioning and handover documents, and service and maintenance after the system is running.

Can it replace our design tool?

Usually it should not. Design and proposal tools for PV layout and yield are specialised products. The installer software takes the design, bill of materials and proposal from them through their interface or export and runs everything that happens after the customer signs.

Can it track permits and grid connection applications?

Yes. Each project has its permit and grid steps as tasks with documents, submission dates, reference numbers and expected answers. Projects waiting on a network operator are visible in one list, and crews are not booked until the steps you require are approved.

Does it plan roof crews and electricians separately?

Yes. Roof mounting and electrical work are separate tasks with their own crew types, qualifications and durations. The board plans them in the right order, checks that fall protection equipment and training are in place, and moves both when weather stops roof work.

Can it handle service and maintenance after installation?

Yes. Every installed system becomes an asset with its components, serial numbers and warranties. Monitoring alerts from inverter platforms can open service jobs, and maintenance contracts plan inspections and cleaning visits.

Who owns the system?

Your company. The source code sits in a repository in your own account, and the database and hosting are in your name in an EU data region.

Get a written quote

Tell us in a few lines what you need. We reply within one working day with a written quote: scope, timeline and a fixed price or an hour estimate. Asking is free and commits you to nothing.

See every price · Contact details

Request a quote